Research on a JIT scheduling problem in parallel motorcycle assembly lines considering actual situations
Year of publication: |
2012
|
---|---|
Authors: | Sun, Di-hua ; Song, Xiao-xiao ; Zhao, Min ; Zheng, Lin-jiang |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 18 (15.9.), p. 4923-4936
|
Subject: | artificial fish swarm algorithm | co-ordinate coding | just-in-time | scheduling model | Just in Time | Just in time | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Durchlaufzeit | Lead time |
-
Faccio, Maurizio, (2018)
-
A reactive GRASP and Path Relinking for balancing reconfigurable transfer lines
Essafi, Mohamed, (2012)
-
Maleki-Darounkolaei, Aref, (2012)
- More ...
-
Sun, Di-hua, (2012)
-
Scheduling flexible job shop problem subject to machine breakdown with game theory
Sun, Di-hua, (2014)
-
Analysis of two-lane lattice hydrodynamic model with consideration of drivers’ characteristics
Zhang, Geng, (2015)
- More ...