//-->
Towards an integrated workload control (WLC) concept : the performance of due date setting rules in job shops with contingent orders
Thürer, Matthias, (2013)
Smoothed analysis of the 𝜅-swap neighborhood for makespan scheduling
Rohwedder, Lars, (2025)
Multiobjective unrelated parallel machines scheduling problem with periodic maintenance activities and dependent processing times
Yaghtin, Mohammad, (2025)
Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries
Steiner, George, (2011)
Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains
Steiner, George, (2009)
Optimal coordination of resource allocation, due date assignment and scheduling decisions
Shabtay, Dvir, (2016)