Revisit the scheduling problem with assignable or generalized due dates to minimize total weighted late work
| Year of publication: |
2023
|
|---|---|
| Authors: | Chen, Rubing ; Gao, Yuan ; Geng, Zhichao ; Yuan, Jinjiang |
| Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 61.2023, 22, p. 7630-7648
|
| Subject: | algorithms | assignable/generalized due dates | NP-hard | Scheduling | total weighted late work | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Theorie | Theory | Durchlaufzeit | Lead time |
-
Chen, Rubing, (2025)
-
Sang, Yao-Wen, (2023)
-
A hybrid algorithm to solve the stochastic flow shop scheduling problems with machine break down
Marichelvam, M. K., (2019)
- More ...
-
Pareto-scheduling of two competing agents with their own equal processing times
Chen, Rubing, (2022)
-
Chen, Rubing, (2019)
-
Single-machine scheduling of multiple projects with controllable processing times
Geng, Zhichao, (2023)
- More ...