Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time
Year of publication: |
2025
|
---|---|
Authors: | Wang, Xu ; Zhao, Qiuhong ; Liu, Shixin ; Wang, Jia ; Qi, Liang |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 63.2025, 5, p. 1707-1724
|
Subject: | improved column and cut generation method | innovation and infrastructure | integrated crane assignment and scheduling | robustness | Slab yard | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Robustes Verfahren | Robust statistics | Mathematische Optimierung | Mathematical programming | Kran | Crane |
-
Mathematical models and heuristics for double-load crane scheduling in slab yards
Dong, Zixiong, (2025)
-
Wang, Chong, (2025)
-
A robust optimization approach to the integrated berth allocation and quay crane assignment problem
Shang, Xiao Ting, (2016)
- More ...
-
A 0-1 integer programming model and solving strategies for the slab storage problem
Lu, Chao, (2016)
-
Column generation algorithms for mother plate design in steel plants
Zhang, Qi, (2021)
-
A branch-and-price algorithm for the multi-trip multi-repairman problem with time windows
Liu, Shixin, (2018)
- More ...