Route planning for two wafer fabs with capacity-sharing mechanisms
Year of publication: |
2009
|
---|---|
Authors: | Wu, Muh-Cherng ; Chen, Chen-Fu ; Shih, Chang-Fu |
Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 47.2009, 20, p. 5843-5856
|
Saved in:
Saved in favorites
Similar items by person
-
An analysis of the ceiling height requirement for a large-scale semiconductor fab
Wu, Muh-Cherng, (2010)
-
An analysis of the ceiling height requirement for a large-scale semiconductor fab
Wu, Muh-Cherng, (2010)
-
Route planning for two fabs with capacity-sharing mechanisms
Wu, Muh-cherng, (2009)
- More ...