//-->
Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date
Sakuraba, Celso S., (2009)
Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date
Błażewicz, Jacek, (2008)
Double-row facility layout with replicate machines and split flows
Gülşen, Mehmet, (2019)
Scheduling identical jobs and due-window on uniform machines
Mosheiov, Gur, (2010)
Minimum weighted number of tardy jobs on an m-machine flow-shop with a critical machine
Due-date assignment on uniform machines
Mosheiov, Gur, (2009)