Scheduling a two-stage assembly problem with separated setup time to minimise total tardiness
| Year of publication: |
2025
|
|---|---|
| Authors: | Luo, JianChao ; Liu, ZhiQiang ; Fan, JiaLi ; Wang, Jun-Qiang ; Feng, YanXiang ; Xu, Jun |
| Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 63.2025, 7, p. 2456-2482
|
| Subject: | branch and bound | Scheduling | setup time | two-stage assembly | variable neighbourhood search | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Branch-and-Bound | Branch and Bound | Heuristik | Heuristics |
-
Luo, JianChao, (2019)
-
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
Jeong, BongJoo, (2014)
-
Minimising maximum tardiness in assembly flowshops with setup times
Aydilek, Asiye, (2017)
- More ...
-
Luo, JianChao, (2019)
-
The nature and sources of economic growth in China : is there TFP growth?
Liu, Zhiqiang, (2002)
-
Children's education and parental health : evidence from China
Liu, Zhiqiang, (2021)
- More ...