Scheduling dynamic job shop manufacturing cells with family setup times : a simulation study
| Year of publication: |
December 2017
|
|---|---|
| Authors: | Klausnitzer, Armin ; Neufeld, Janis S. ; Buscher, Udo |
| Published in: |
Logistics research. - Berlin : Springer, ISSN 1865-0368, ZDB-ID 2448348-5. - Vol. 10.2017, 4, p. 1-18
|
| Subject: | group scheduling | job shop | cellular manufacture | production logistics | heuristics | dispatching rules | simulation | Simulation | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Fertigungsinsel | Cellular manufacturing | Produktionssteuerung | Production control | Theorie | Theory |
-
Statistical analysis of family based dispatching rules and preemption
Jing, Hao, (2021)
-
Scheduling dynamic job shop manufacturing cells with family setup times: A simulation study
Klausnitzer, Armin, (2017)
-
Cell loading and family scheduling for jobs with individual due dates to minimise maximum tardiness
Süer, Grüsel A., (2014)
- More ...
-
Order acceptance and scheduling in capacitated job shops
Linß, Florian, (2025)
-
The distributed flow shop scheduling problem with inter-factory transportation
Becker, Tristan, (2025)
-
An efficient column generation approach for practical railway crew scheduling with attendance rates
Neufeld, Janis S., (2021)
- More ...