//-->
Performance enhancement by using non-permutation schedules in flowline-based manufacturing systems
Pugazhendhi, S., (2003)
A modified ant-colony optimisation algorithm to minimise the completion time variance of jobs in flowshops
Krishnaraj, J., (2012)
Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
Thiagarajan, S., (2005)