Scheduling jobs with equal-processing-time on parallel machines with non-identical capacities to minimize makespan
| Year of publication: |
2014
|
|---|---|
| Authors: | Wang, Jun-qiang ; Leung, Jospeh Y.-T. |
| Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 156.2014, p. 325-331
|
| Subject: | Batch machines | Makespan | NP-hard | Approximation algorithm | Absolute worst-case ratio | Asymptotic worst-case ratio | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Algorithmus | Algorithm | Durchlaufzeit | Lead time | Produktionssteuerung | Production control | Operations Research | Operations research |
-
Jia, Zhao-hong, (2014)
-
Zhou, Shengchao, (2016)
-
Ozturk, Onur, (2017)
- More ...
-
Scheduling a two-stage assembly problem with separated setup time to minimise total tardiness
Luo, JianChao, (2025)
-
Shifting bottleneck-driven TOCh for solving product mix problems
Chen, Jian, (2021)
-
Cui, Peng-Hao, (2022)
- More ...