Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop
Year of publication: |
2021
|
---|---|
Authors: | Jafari-Nodoushan, Abbasali ; Zare, Hassan Khademi ; Lotfi, Mohammad Mehdi ; Tavakkoli-Moghaddam, R. |
Published in: |
Operations research forum. - Cham : Springer International Publishing, ISSN 2662-2556, ZDB-ID 2978290-9. - Vol. 2.2021, 4, Art.-No. 49, p. 1-29
|
Subject: | Scheduling | Flowshop | Deteriorating jobs | Branch and bound | Heuristic | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Durchlaufzeit | Lead time | Branch-and-Bound | Branch and Bound | Produktionssteuerung | Production control | Theorie | Theory |
-