Scheduling with release dates and preemption to minimize multiple max-form objective functions
| Year of publication: |
2020
|
|---|---|
| Authors: | Yuan, Jinjiang ; Ng, C. T. ; Cheng, T. C. E. |
| Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 280.2020, 3 (1.2.), p. 860-875
|
| Subject: | Machine scheduling | Multi-agent | Multi-criteria | Pareto scheduling | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Agentenbasierte Modellierung | Agent-based modeling | Produktionssteuerung | Production control |
-
Huang, Ching-jen, (2012)
-
Single-machine scheduling with multi-agents to minimize total weighted late work
Li, Shi-Sheng, (2020)
-
An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines
Gu, Manzhan, (2018)
- More ...
-
Gao, Yuan, (2019)
-
Chen, Rubing, (2021)
-
Fu, Ruyan, (2013)
- More ...