Single machine scheduling with assignable due dates to minimize maximum and total late work
| Year of publication: |
2023
|
|---|---|
| Authors: | Justkowiak, Jan-Erik ; Kovalev, Sergey ; Kovalyov, Mikhail Y. ; Pesch, Erwin |
| Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 308.2023, 1 (1.7.), p. 76-83
|
| Subject: | Assignable due dates | FPTAS | Late work | Scheduling | Single machine | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Durchlaufzeit | Lead time | Produktionssteuerung | Production control |
-
Scheduling with assignable due dates, two competing agents and late work related criteria
Li, Shi-Sheng, (2025)
-
Minimizing maximum tardiness on a single machine with family setup times and machine disruption
Molaee, Ehsan, (2021)
-
An almost exact solution to the min completion time variance in a single machine
Nasini, Stefano, (2021)
- More ...
-
Scheduling electric vehicle regular charging tasks : a review of deterministic models
Dolgui, Alexandre, (2025)
-
Integer knapsack problems with profit functions of the same value range
Gurevsky, Evgeny, (2023)
-
A note on scheduling identical parallel machines with preemptions and setup times
Boudhar, Mourad, (2025)
- More ...