Solving the multi objective flow shop scheduling problems using an improved NSGA-II
| Year of publication: |
September 2018
|
|---|---|
| Authors: | Lebbar, Ghita ; El Abbassi, Ikram ; El Barkany, Abdellah ; Jabri, Abdelouahhab ; Darcherif, Abdel Moumen |
| Published in: |
International journal of operations and quantitative management : IJOQM. - Houston, Tex. : INFOMS, ISSN 1082-1910, ZDB-ID 1290624-4. - Vol. 24.2018, 3, p. 211-230
|
| Subject: | Permutation Flow Shop | Multi objective Optimization | Blocking Flow Shop | Makespan | Maximum Tardiness | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm | Theorie | Theory | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis |
-
A bi-objective scheduling problem on batch machines via a Pareto-based ant colony system
Xu, Rui, (2013)
-
Minimising maximum tardiness in assembly flowshops with setup times
Aydilek, Asiye, (2017)
-
Viswanath, Anjana, (2019)
- More ...
-
Heuristics for solving the intgrated planning and scheduling problem
Hassani, Zineb Ibn Majdoub, (2018)
-
Planning and scheduling problems of production systems : review, classification and opportunities
Hassani, Zineb Ibn Majdoub, (2019)
-
Aarab, Sanae, (2017)
- More ...