Supporting flexibility of kit preparation for mixed-model assembly
Year of publication: |
2021
|
---|---|
Authors: | Fager, Patrik ; Hanson, Robin ; Medbo, Lars ; Johansson, Mats I. |
Published in: |
International journal of logistics systems and management : IJLSM. - Genève [u.a.] : Inderscience Enterprises, ISSN 1742-7975, ZDB-ID 2204294-5. - Vol. 40.2021, 4, p. 541-560
|
Subject: | flexibility | in-plant materials supply | kit preparation | kitting | materials handling | mixed-model assembly | order picking | production flexibility | Fließfertigung | Assembly-line production | Flexibles Fertigungssystem | Flexible manufacturing system | Flexibilität | Flexibility | Materialfluss | Material flow | Auftragsabwicklung | Order processing | Produktionsplanung | Production planning | Scheduling-Verfahren | Scheduling problem |
-
Man-hour efficiency of manual kit preparation in the materials supply to mass-customised assembly
Hanson, Robin, (2019)
-
Links between kit quality and kit preparation design
Fager, Patrik, (2021)
-
Cost modelling of onboard cobot-supported item sorting in a picking system
Fager, Patrik, (2021)
- More ...
-
Links between kit quality and kit preparation design
Fager, Patrik, (2021)
-
Brynzér, Henrik, (1994)
-
Reflective Production in the Final Assembly of Motor Vehicles – An Emerging Swedish Challenge
Ellegärd, Kajsa, (1992)
- More ...