The block planning approach for continuous time-based dynamic lot sizing and scheduling
Year of publication: |
2014
|
---|---|
Authors: | Günther, Hans-Otto |
Published in: |
Business research. - Heidelberg : Springer, ISSN 2198-2627, ZDB-ID 2426376-X. - Vol. 7.2014, 1, p. 51-76
|
Subject: | Lot sizing and scheduling | Block planning | Mixed-integer linear programming | Mathematische Optimierung | Mathematical programming | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Losgröße | Lot size | Produktionsplanung | Production planning |
Extent: | graph. Darst. |
---|---|
Type of publication: | Article |
Type of publication (narrower categories): | Aufsatz in Zeitschrift ; Article in journal |
Language: | English |
Notes: | Systemvoraussetzungen: Acrobat Reader |
Other identifiers: | 10.1007/s40685-014-0003-y [DOI] hdl:10419/105158 [Handle] |
Classification: | C61 - Optimization Techniques; Programming Models; Dynamic Analysis ; M11 - Production Management |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Optimal Production Planning in Pull Flow Lines with Multiple Products
Yan, Houmin, (2008)
-
A note on ending inventory valuation in multiperiod production scheduling
Heuvel, Wilco van den, (2002)
-
Toledo, Claudio Fabiano Motta, (2014)
- More ...
-
The block planning approach for continuous time-based dynamic lot sizing and scheduling
Günther, Hans-Otto, (2014)
-
Produktion und Logistik ; [Hauptbd.]
Günther, Hans-Otto, (1997)
-
Produktion und Logistik : Supply Chain und Operations Management
Günther, Hans-Otto, (1994)
- More ...