The block planning approach for continuous time-based dynamic lot sizing and scheduling
Year of publication: |
2014
|
---|---|
Authors: | Günther, Hans-Otto |
Published in: |
Business Research. - Heidelberg : Springer, ISSN 2198-2627. - Vol. 7.2014, 1, p. 51-76
|
Publisher: |
Heidelberg : Springer |
Subject: | Lot sizing and scheduling | Block planning | Mixed-integer linear programming |
Type of publication: | Article |
---|---|
Type of publication (narrower categories): | Article |
Language: | English |
Other identifiers: | 10.1007/s40685-014-0003-y [DOI] 798615621 [GVK] hdl:10419/105158 [Handle] |
Classification: | C61 - Optimization Techniques; Programming Models; Dynamic Analysis ; M11 - Production Management |
Source: |
-
The block planning approach for continuous time-based dynamic lot sizing and scheduling
Günther, Hans-Otto, (2014)
-
Mattik, Imke, (2014)
-
On the convexity of the cost function for the (Q,R) inventory model
Halkos, George, (2014)
- More ...
-
Produktionsplanung bei flexibler Personalkapazität
Günther, Hans-Otto, (1989)
-
Dimensionierung der Produktionskapazität bei Unsicherheit der Nachfrage
Günther, Hans-Otto, (1994)
-
Einsatz von Simulations- und Optimierungsmodellen in der chemischen Industrie
Günther, Hans-Otto, (1999)
- More ...