//-->
On the calculation of the stability radius of an optimal or an approximate schedule
Sotskov, Jurij Nazarovič, (1997)
On the complexity of two machine job-shop scheduling with regular objective functions
Brucker, Peter, (1997)
Heuristics for permutation flow shop scheduling with batch setup times
Sotskov, Jurij Nazarovič, (1996)