THE CYCLIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS
| Year of publication: |
1988
|
|---|---|
| Authors: | DOBSON, G. |
| Institutions: | William E. Simon Graduate School of Business Administration, University of Rochester |
| Subject: | production | information | business cycles |
-
FINANCIAL CAPACITY AND OUTPUT FLUCTUATIONS IN AN ECONOMY WITH MULTIPERIOD FINANCIAL RELATIONSHIPS
Gertler, Mark, (1990)
-
Aggregate Stability and Balanced-Budget Rules
Ghilardi, Matteo, (2014)
-
OUTPUT GROWTH, THE REAL WAGE, AND EMPLOYMENT FLUCTUATIONS.
HERCOVITZ, Z., (1989)
- More ...
-
Cyclic Scheduling to Maximize Inventory in a Batch Line.
Dobson, G., (1990)
-
Product Line and Technology Selection with shared Manufacturing and Engineering Design Resources.
Dobson, G., (1994)
-
A CLOSED LOOP AUTOMATIC SCHEDULING SYSTEM (CLASS).
DOBSON, G., (1988)
- More ...