The distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery
| Year of publication: |
2021
|
|---|---|
| Authors: | Yang, Shengluo ; Xu, Zhigang |
| Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 59.2021, 13, p. 4053-4071
|
| Subject: | batch delivery | distributed assembly flowshop | flexible assembly | iterated greedy | scheduling | variable neighbourhood descent | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Durchlaufzeit | Lead time | Heuristik | Heuristics | Produktionsplanung | Production planning | Algorithmus | Algorithm | Produktionssteuerung | Production control | Theorie | Theory | Evolutionärer Algorithmus | Evolutionary algorithm |
-
Mozdgir, A., (2013)
-
Cheng, Long, (2025)
-
The optimal number of used machines in a two-stage flexible flowshop scheduling problem
Gerstl, Enrique, (2014)
- More ...
-
Intelligent scheduling and reconfiguration via deep reinforcement learning in smart manufacturing
Yang, Shengluo, (2022)
-
Product family formation based on optimal resource sequence for reconfigurable manufacturing system
Zhu, Xiaojun, (2025)
-
Liu, Chenglin, (2025)
- More ...