| Type of publication: | Article |
|---|---|
| Type of publication (narrower categories): | Congress Report |
| Language: | English |
| Notes: | Cantarelli, Chantal, Flyvbjerg, Bent, van Wee, Bert and Molin, Eric J. E. (2008) The role of lock-in in cost overruns of large-scale transportation infrastructure projects. In: NGI/IEEE Conference Infrastructure Systems, 10-12 November, Rotterdam. |
| Source: | BASE |
Persistent link: https://www.econbiz.de/10011424266