The SPT Priority Sequence Rule : The Illusion of Efficiency and the Reality of Bottlenecks
Year of publication: |
1994
|
---|---|
Authors: | Bassett, Glenn ; Todd, Robert |
Published in: |
International Journal of Operations & Production Management. - MCB UP Ltd, ISSN 1758-6593, ZDB-ID 2032083-8. - Vol. 14.1994, 12, p. 70-78
|
Publisher: |
MCB UP Ltd |
Subject: | Bottlenecks | Process control | Simulation | Work measurement | Work scheduling |
-
Assembly line productivity improvement as re-engineered by MOST
Karim, A.N. Mustafizul, (2016)
-
Assembly line productivity improvement as re-engineered by MOST
Karim, A. N. Mustafizul, (2016)
-
Bottleneck identification through simulation modelling : a case of solid tire manufacturing sector
Edirisinghe, E. A. D. D. D., (2023)
- More ...
-
The SPT Priority Sequence Rule: The Illusion of Efficiency and the Reality of Bottlenecks
Bassett, Glenn, (1994)
-
Management strategies for today's project shop economy
Bassett, Glenn A., (1991)
-
INDUSTRIAL HEMP AS AN ALTERNATIVE CROP IN NORTH DAKOTA
Kraenzel, David G., (1998)
- More ...