Two-machine flow shop scheduling with deteriorating jobs : minimizing the weighted sum of makespan and total completion time
Year of publication: |
2015
|
---|---|
Authors: | Cheng, Mingbao ; Tadikamalla, Pandu R. ; Shang, Jennifer ; Zhang, Bixi |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 716033-1. - Vol. 66.2015, 5, p. 709-719
|
Subject: | scheduling | flow shop | bi-criteria | deteriorating jobs | branch-and-bound | heuristics | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Branch-and-Bound | Branch and Bound |
-
Sun, Xinyu, (2021)
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
-
A two-stage three-machine assembly scheduling problem with deterioration effect
Wu, Chin-Chia, (2019)
- More ...
-
Cheng, Mingbao, (2015)
-
Cheng, Mingbao, (2014)
-
Cheng, Mingbao, (2014)
- More ...