Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times
| Year of publication: |
2013
|
|---|---|
| Authors: | Mozdgir, A. ; Fatemi Ghomi, S. M. T. ; Jolai, F. ; Navaei, J. |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 12 (15.6.), p. 3625-3642
|
| Subject: | assembly flow-shop | hybrid VNS heuristic | mathematical model | non-identical assembly machines | sequence dependent setup time | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Durchlaufzeit | Lead time | Theorie | Theory | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm | Algorithmus | Algorithm | Produktionssteuerung | Production control | Produktionsplanung | Production planning |
-
Navaei, Javad, (2014)
-
Yang, Shengluo, (2021)
-
Cheng, Long, (2025)
- More ...
-
Mirabi, Mohammad, (2014)
-
The causal relationship among electricity consumption, economic growth and capital stock in Iran
Salmanzadeh-Meydani, N., (2019)
-
Alamatsaz, Kayhan, (2021)
- More ...