Using Resource Scarceness Characteristics to Solve the Multi-Mode Resource-Constrained Project Scheduling Problem
| Year of publication: |
2009-06
|
|---|---|
| Authors: | PETEGHEM, V. VAN ; VANHOUCKE, M. |
| Institutions: | Faculteit Economie en Bedrijfskunde, Universiteit Gent |
| Subject: | project scheduling | scatter search | multi-mode RCPSP | resource scarceness matrix |
-
Multi-mode resource constrained pro ject scheduling using RCPSP and SAT solvers
COELHO, J., (2009)
-
A Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem
PETEGHEM, V. VAN, (2008)
-
A hybrid scatter search / electromagnetism meta-heuristic for project scheduling
Debels, Dieter, (2003)
- More ...
-
Introducing Learning Effects in Resource-constrained Project Scheduling
PETEGHEM, V. VAN, (2010)
-
An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem
PETEGHEM, V. VAN, (2009)
-
A Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem
PETEGHEM, V. VAN, (2008)
- More ...