Valid inequalities for proportional lot-sizing and scheduling problem with fictitious microperiods
Year of publication: |
2020
|
---|---|
Authors: | Kaczmarczyk, Waldemar |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 219.2020, p. 236-247
|
Subject: | Lot-sizing and scheduling | Mixed integer linear programming | Production | Scheduling-Verfahren | Scheduling problem | Losgröße | Lot size | Ganzzahlige Optimierung | Integer programming | Theorie | Theory | Produktionsplanung | Production planning | Mathematische Optimierung | Mathematical programming |
-
A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty
Hu, Zhengyang, (2016)
-
Hu, Zhengyang, (2020)
-
Löhndorf, Nils, (2014)
- More ...
-
Optimal versus heuristic scheduling of surface mount technology lines
Kaczmarczyk, Waldemar, (2004)
-
Proportional lot-sizing and scheduling problem with identical parallel machines
Kaczmarczyk, Waldemar, (2011)
-
Proportional lot-sizing and scheduling problem with identical parallel machines
Kaczmarczyk, Waldemar, (2011)
- More ...