Which is better for replacement policies with continuous or discrete scheduled times?
Year of publication: |
2015
|
---|---|
Authors: | Zhao, Xufeng ; Mizutani, Satoshi ; Nakagawa, Toshio |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 242.2015, 2 (16.4.), p. 477-486
|
Subject: | Continuous replacement | Discrete replacement | Replacement overtime | Working cycle | Operational interruption | Theorie | Theory | Ersatzinvestition | Reinvestment | Überbeschäftigung | Overemployment | Scheduling-Verfahren | Scheduling problem |
-
Which is better for replacement policies with continuous or discrete scheduled times?
Zhao, Xufeng, (2015)
-
Parallel machine replacement with shipping decisions
Shields, Brett A., (2019)
-
Modeling Single Machine Preemptive Scheduling to Minimize the Cost of Tardiness and Overtime
Jaramillo, Fernando, (2018)
- More ...
-
Which is better for replacement policies with continuous or discrete scheduled times?
Zhao, Xufeng, (2015)
-
Optimum problems in backward times of reliability models
Nakagawa, Toshio, (2009)
-
Optimum problems in backward times of reliability models
Nakagawa, Toshio, (2008)
- More ...