EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: isPartOf:"Economic Quality Control"
Narrow search

Narrow search

Year of publication
Subject
All
Maximum Likelihood Estimation 3 Consumer's Risk 2 Poisson distribution 2 Producer's Risk 2 ARL 1 Acceptable Quality Level (AQL) 1 Acceptance Sampling Plan 1 Adaptive Control Charts 1 Attribute Plan 1 Availability 1 Average Run Length 1 Bayes Estimator 1 Bayesian Approach 1 Bayesian Sampling Plan 1 Bernoulli Stochastics 1 Bhattacharyya Bound 1 Binomial distribution 1 Burr Type III Distribution 1 Burr Type XII Distribution 1 Change Point 1 Confluent hypergeometric series 1 Conjugate Prior 1 Control Limits 1 Coverage probability 1 Cramèr-Rao Bound 1 Cramér–Rao bound 1 Cubic Exponential Family (NEF-CVF) 1 Data Transformation 1 Determing Naximum Run-up Height 1 Displaced Poisson 1 Displaced Poisson distribution 1 EM Algorithm 1 EM Test 1 Exponential Distribution 1 Factorial moments 1 Generalized Gamma Distribution 1 Godambe Information Matrix 1 Gumbel's Bivariate Exponential Copula 1 Hammersley-Chapman-Robins Bound 1 Hammersley–Chapman–Robbins bound 1
more ... less ...
Online availability
All
Undetermined 268
Type of publication
All
Article 268 Book / Working Paper 2
Type of publication (narrower categories)
All
Graue Literatur 1 Non-commercial literature 1
Language
All
Undetermined 269 English 1
Author
All
Elart, von Collani 18 Hanagal David D. 10 Kantam R. R. L. 8 Moustafa Magdi S. 8 Saralees, Nadarajah 8 Chung-Ho, Chen 7 Nandini, Das 7 Anis M. Z. 6 Chao-Yu, Chou 5 Govindaraju K. 5 Lee, Ho Linda 5 Monica, Dumitrescu 5 Srinivasa, Rao G. 5 Vijayaraghavan R. 5 Wolfgang, Sans 5 Xiaomin, Zhai 5 Nikolai, Kolev 4 Rattihalli R. N. 4 Anwer, Khurshid 3 Biswabrata, Pradhan 3 Chakraborty Ashit B. 3 Dietmar, Ferger 3 Elbatal I. 3 Gadre M. P. 3 Ibrahim, Al-Omari Amer 3 Jürgen, Franz 3 Keoagile, Thaga 3 Loganathan A. 3 Mahmoud M. A. W. 3 Manju, Agarwal 3 Mujahida, Sayyed 3 Satheesh, Kumar C. 3 Singh Housila P. 3 Surath, Sen 3 Abbas, Pak 2 Abdul, Alim N. A. 2 Agnihothram G. 2 Ansgar, Steland 2 Arulmozhi G. 2 Chimka Justin R. 2
more ... less ...
Institution
All
Julius-Maximilians-Universität Würzburg / Institut für Angewandte Mathematik und Statistik 1
Published in...
All
Economic Quality Control 268 Economic quality control : research reports of The Würzburg Research Group on Quality Control 1 Economic quality control : research reports of the Würzburg Research Group on Quality Control 1
Source
All
RePEc 268 ECONIS (ZBW) 1 USB Cologne (EcoSocSci) 1
Showing 261 - 270 of 270
Cover Image
An Integrated Approach for Designing a Sampling Plan and Fixing Specifications
Chung-Ho, Chen; Chao-Yu, Chou - In: Economic Quality Control 16 (2001) 1, pp. 43-48
In 1986 Taguchi presented the quadratic function for describing the loss of quality due to deviation from the production value. The objective then is to improve quality by minimizing the quadratic loss function which reflects the loss of both, the producer and the consumer. Subsequently, Kapur...
Persistent link: https://www.econbiz.de/10010736164
Saved in:
Cover Image
Neyman Measurement and Prediction Procedures
Elart, von Collani; Monica, Dumitrescu; Rouven, Lepenis - In: Economic Quality Control 16 (2001) 1, pp. 109-132
Consider the following two situations which are characteristic for the application of statistical procedures.
Persistent link: https://www.econbiz.de/10010736167
Saved in:
Cover Image
Towards Practical and Synthetical Modelling of Repairable Systems
Guo R.; Ascher H.; Love E. - In: Economic Quality Control 16 (2001) 1, pp. 147-182
In this article, we survey the developments with respect to generalized models of repairable systems during the 1990s, particularly for the last five years. In this field, we notice the sharp fundamental problem that voluminous and complicated models are proposed without sufficient evidence (or...
Persistent link: https://www.econbiz.de/10010736187
Saved in:
Cover Image
Bayesian Single Sampling Plans for a Gamma Prior
Suresh K. K.; Latha M. - In: Economic Quality Control 16 (2001) 1, pp. 93-107
The average probability of acceptance (APA) is obtained for a single sampling plan assuming a Gamma prior distribution. Formula for inflection point and tangent at the inflection point are also derived. Tables are provided for selection of plan parameters.
Persistent link: https://www.econbiz.de/10010736197
Saved in:
Cover Image
Squared Error Loss of Process Capability Indices
Chung-Ho, Chen; Chao-Yu, Chou - In: Economic Quality Control 16 (2001) 2, pp. 205-209
In this paper, we extend Johnson's work [Johnson, T. Journal of Quality Technology 24: 211-215, 1992] of formulating the relationship between process capability indices (PCI) and expected squared error losses. Moreover, a comparison is made between the expected squared error loss of PCI under...
Persistent link: https://www.econbiz.de/10010736206
Saved in:
Cover Image
Optimal Productivity and Investments in Quality: An Operations Parametric Model
Kulkarni Shailesh S.; Jayakumar Maliyakal D.; Prybutok … - In: Economic Quality Control 16 (2001) 2, pp. 255-269
In this paper we present a mathematical model of a generic manufacturing system. The quality of the manufactured product is captured through one or more of its critical design/process parameters. Managers often face the dilemma of which product/process is to be singled out for improvement in...
Persistent link: https://www.econbiz.de/10010736215
Saved in:
Cover Image
Availability of K-out-of-N:G Systems with Exponential Failures and General Repairs
Moustafa Magdi S. - In: Economic Quality Control 16 (2001) 1, pp. 75-82
For deriving the steady state probabilities and the availability of K-out-of-N:G systems with constant failure rate and general repairs an imbedded Markov chain at repair completion epochs is used. The special cases of constant repair time, Coxian-2 and Erlang-2 repair time distributions are...
Persistent link: https://www.econbiz.de/10010736218
Saved in:
Cover Image
A Note on the Convolution of the Uniform and Related Distributions and Their Use in Quality Control
Frank, Killmann; Elart, von Collani - In: Economic Quality Control 16 (2001) 1, pp. 17-41
Consider a product with quality characteristic X. Assume that the product is composed of n parts each with quality characteristic Xi , and and let
Persistent link: https://www.econbiz.de/10011015847
Saved in:
Cover Image
Design of R control Chart Assuming a Gamma Distribution
González I. M.; Viles E. - In: Economic Quality Control 16 (2001) 2, pp. 199-204
, Economic Quality Control 15: 109-118, 2000) …
Persistent link: https://www.econbiz.de/10011015850
Saved in:
Cover Image
OECD PISA - An Example of Stochastic Illiteracy?
Elart, von Collani - In: Economic Quality Control 16 (2001) 2, pp. 227-253
PISA stands for “Programme for International Student Assessment” performed, by the OECD and consisting of a cyclic evaluation of the new generations' basic competences. The first evaluation took place in 2000 and the results were published on 4 December 2001. According to the official...
Persistent link: https://www.econbiz.de/10011015852
Saved in:
  • First
  • Prev
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...