EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: person:"Kim, Yong-Woo"
Narrow search

Narrow search

Year of publication
Subject
All
Activity-based costing 1 Bauprojekt 1 Bauvorhaben 1 Bauwirtschaft 1 Construction industry 1 Construction project 1 Cost management 1 Infrastructure management 1 Kostenmanagement 1 Lieferantenmanagement 1 Lieferkette 1 Rabatt 1 Rebar fabrication 1 Rebate 1 Scheduling problem 1 Scheduling-Verfahren 1 Supplier relationship management 1 Supply chain 1 USA 1 United States 1 activity-based costing 1 cost analysis 1 cost-benefit analysis 1 overhead cost allocation 1 personal digital assistant 1 project strategies 1 public outreach 1 quality inspection 1 web-based system 1
more ... less ...
Online availability
All
Undetermined 3 Free 1
Type of publication
All
Article 3 Book / Working Paper 2
Language
All
Undetermined 3 English 2
Author
All
Kim, Yong-Woo 5 Choi, Kunhee 2 Han, Seungheon 1 Ibbs, C. William 1 Kim, Sang-Chul 1 Lee, Eul-Bum 1 Rhee, Byong 1 Shin, Sungwon 1
more ... less ...
Published in...
All
Construction Management and Economics 3
Source
All
RePEc 3 ECONIS (ZBW) 2
Showing 1 - 5 of 5
Cover Image
Rebate for Scheduled Delivery, Planning Reliability, and Supply Chain Coordination
Kim, Yong-Woo; Rhee, Byong - 2023
An increasing number of construction projects are adopting prefabrication to economize on time, labor, and materials. This method calls for prudent supply chain management, because its performance relies on coordination between the contractor and supplier. Studies in construction management,...
Persistent link: https://www.econbiz.de/10014262274
Saved in:
Cover Image
Activity based costing for construction companies
Kim, Yong-Woo - 2017 - First edition
Persistent link: https://www.econbiz.de/10011629720
Saved in:
Cover Image
A case study of activity-based costing in allocating rebar fabrication costs to projects
Kim, Yong-Woo; Han, Seungheon; Shin, Sungwon; Choi, Kunhee - In: Construction Management and Economics 29 (2011) 5, pp. 449-461
How to improve cost allocation for reinforced steel bar (rebar) is an ongoing topic of debate among construction manufacturers and contractors. Traditionally, many fabrication shops have used a single overhead-cost pool accounting system. However, a new costing method, activity-based costing...
Persistent link: https://www.econbiz.de/10009194437
Saved in:
Cover Image
Cost analysis of information technology-assisted quality inspection using activity-based costing
Kim, Yong-Woo; Kim, Sang-Chul - In: Construction Management and Economics 29 (2011) 2, pp. 163-172
One of the critical factors in quality control is the efficient management of quality field inspections. A method was developed to assess the cost impact of process improvements in construction jobsite management. Through the development of a prototype quality inspection system together with...
Persistent link: https://www.econbiz.de/10009277924
Saved in:
Cover Image
Multifaceted public outreach and cost-benefit analysis for its effectiveness validation
Choi, Kunhee; Lee, Eul-Bum; Ibbs, C. William; Kim, Yong-Woo - In: Construction Management and Economics 27 (2009) 8, pp. 771-782
A heavily trafficked 4.5km highway stretch on Interstate 15 east of Los Angeles was rebuilt using two extended closures, each spanning nine days with 24/7 operations. Before and during the closures, a multifaceted, extensive, dynamic public outreach programme was implemented to gain public...
Persistent link: https://www.econbiz.de/10008466631
Saved in:
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...