EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"Integrated scheduling"
Narrow search

Narrow search

Year of publication
Subject
All
Scheduling problem 28 Scheduling-Verfahren 28 Theorie 20 Theory 20 integrated scheduling 16 Integrated scheduling 13 Algorithm 9 Algorithmus 9 Lieferkette 9 Supply chain 9 Evolutionary algorithm 8 Evolutionärer Algorithmus 8 Mathematical programming 8 Mathematische Optimierung 8 Container terminal 6 Containerterminal 6 Container transport 5 Containerverkehr 5 Crane 4 Heuristics 4 Heuristik 4 Kran 4 Tourenplanung 4 Vehicle routing problem 4 Business process management 3 Logistics 3 Logistik 3 Production control 3 Production planning 3 Produktionsplanung 3 Produktionssteuerung 3 Prozessmanagement 3 genetic algorithm 3 yard crane scheduling 3 Coal 2 Cost-benefit analysis 2 Flexible manufacturing system 2 Flexibles Fertigungssystem 2 Ganzzahlige Optimierung 2 Genetic algorithm 2
more ... less ...
Online availability
All
Undetermined 26 Free 6 CC license 1
Type of publication
All
Article 34
Type of publication (narrower categories)
All
Article in journal 29 Aufsatz in Zeitschrift 29 Article 2 research-article 1
Language
All
English 32 Undetermined 2
Author
All
Amberg, Bastian 2 Eltawil, Amr Bahgat 2 Gao, Ziyou 2 Ge, Ying-En 2 Gheith, Mohamed Samir 2 Iijima, Junichi 2 Kliewer, Natalia 2 Li, Xiang 2 Mertens, Lucas 2 Naeem, Doaa 2 Wang, Gang 2 Ahmadi-Javid, Amir 1 An, Bo 1 Bettayeb, Belgacem 1 Cao, Pengliang 1 Cao, Zhen 1 Chang, Chien-min 1 Chansombat, Sirikarn 1 Chen, Jihong 1 Chen, Zhi-Long 1 Devapriya, Priyantha 1 Dong, Ming 1 Feng, Peng 1 Ferrell, William 1 Gao, Yunfeng 1 Geismar, Neil 1 Giard, Vincent 1 Guo, Weifei 1 Guo, Zijian 1 He, Naihui 1 Hicks, Christian 1 Hilali, Hajar 1 Hooshangi-Tabrizi, Pedram 1 Hovelaque, Vincent 1 Hu, Xiaoxuan 1 Huang, Jiawei 1 Huang, Senjia 1 Jiang, Guiyan 1 Jiang, Ying 1 Jiang, Zhibin 1
more ... less ...
Published in...
All
International journal of production research 13 Computers & operations research : and their applications to problems of world concern ; an international journal 4 International journal of shipping and transport logistics : IJSTL 2 Logistics 2 Omega : the international journal of management science 2 Chinese Management Studies 1 Chinese management studies : CMS 1 Computers & operations research : an international journal 1 European journal of operational research : EJOR 1 Management Science 1 Maritime policy & management 1 Operations Research Forum 1 Operations research forum 1 Research in Transportation Economics 1 Transportation research / E : an international journal 1 Transportation research : an international journal 1
more ... less ...
Source
All
ECONIS (ZBW) 29 EconStor 2 RePEc 2 Other ZBW resources 1
Showing 1 - 10 of 34
Cover Image
A hybrid approach using ant colony optimisation for integrated scheduling of production and transportation tasks within flexible manufacturing systems
He, Naihui; Sahnoun, M'hammed; Zhang, David; Bettayeb, … - In: Computers & operations research : an international journal 180 (2025), pp. 1-13
Persistent link: https://www.econbiz.de/10015433630
Saved in:
Cover Image
Integrated scheduling of production and material delivery for the intelligent manufacturing system
Liang, Tianning; Zhou, Liping; Jiang, Zhibin - In: International journal of production research 63 (2025) 3, pp. 882-903
Persistent link: https://www.econbiz.de/10015198425
Saved in:
Cover Image
Integrated Bus Timetabling and Scheduling with a Mutation-Based Evolutionary Scheme Maximizing Headway Quality and Connections
Mertens, Lucas; Amberg, Bastian; Kliewer, Natalia - In: Operations Research Forum 5 (2024) 1
Public transport planning is a multi-level process that includes various complex tasks. These tasks are traditionally executed sequentially, and the result of each task serves as input for consecutive tasks. A simultaneous integrated consideration of multiple tasks may lead to an overall...
Persistent link: https://www.econbiz.de/10015399583
Saved in:
Cover Image
Integrated bus timetabling and scheduling with a mutation-based evolutionary scheme maximizing headway quality and connections
Mertens, Lucas; Amberg, Bastian; Kliewer, Natalia - In: Operations research forum 5 (2024) 1, pp. 1-59
Persistent link: https://www.econbiz.de/10014517896
Saved in:
Cover Image
Cooperative multi-agent reinforcement learning for multi-area integrated scheduling in wafer fabs
Wang, Ming; Zhang, Jie; Zhang, Peng; Jin, Mengyu - In: International journal of production research 63 (2025) 8, pp. 2871-2888
Persistent link: https://www.econbiz.de/10015445174
Saved in:
Cover Image
Multi-equipment integrated scheduling for stereo container terminals
Zhao, Zhongbin; Chen, Jihong; Shen, Mengru; Liang, Yuxin; … - In: Transportation research : an international journal 201 (2025), pp. 1-42
Persistent link: https://www.econbiz.de/10015451553
Saved in:
Cover Image
Integrated scheduling of multi-objective lot-streaming hybrid flowshop with AGV based on deep reinforcement learning
Tang, Hongtao; Huang, Jiawei; Ren, Chenhao; Shao, Yiping; … - In: International journal of production research 63 (2025) 4, pp. 1275-1303
Persistent link: https://www.econbiz.de/10015202272
Saved in:
Cover Image
Integrated scheduling of automated yard cranes and automated guided vehicles with limited buffer capacity of dual-trolley quay cranes in automated container terminals
Naeem, Doaa; Eltawil, Amr Bahgat; Iijima, Junichi; … - In: Logistics 6 (2022) 4, pp. 1-17
by the scheduling of the different handling equipment. Proper integrated scheduling of the handling equipment is crucial …
Persistent link: https://www.econbiz.de/10015194934
Saved in:
Cover Image
Integrated scheduling of automated yard cranes and automated guided vehicles with limited buffer capacity of dual-trolley quay cranes in automated container terminals
Naeem, Doaa; Eltawil, Amr Bahgat; Iijima, Junichi; … - In: Logistics 6 (2022) 4, pp. 1-17
by the scheduling of the different handling equipment. Proper integrated scheduling of the handling equipment is crucial …
Persistent link: https://www.econbiz.de/10013552598
Saved in:
Cover Image
Order assignment and two-stage integrated scheduling in fruit and vegetable supply chains
Wang, Gang - In: Omega : the international journal of management science 124 (2024), pp. 1-12
Persistent link: https://www.econbiz.de/10014533517
Saved in:
  • 1
  • 2
  • 3
  • 4
  • Next
  • Last
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...