EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"Level scheduling"
Narrow search

Narrow search

Year of publication
Subject
All
Scheduling 16 level scheduling 16 Scheduling-Verfahren 5 Theorie 5 Fließfertigung 4 Just in Time 4 Level Scheduling 4 Level scheduling 4 Logistik 4 Scheduling problem 4 Theory 4 logistics 4 Assembly-line production 3 Just in time 3 Just-in-time-Prinzip 3 Mixed-model assembly line 3 Mixed-model assembly lines 3 Sequencing 3 just in time 3 Algorithm 2 Algorithmus 2 Car Sequencing 2 Computational Results 2 Constraint Propagation Algorithms 2 Dynamic Programming 2 Dynamische Optimierung 2 Just-in-Time 2 Mathematisches Modell 2 Nonsmooth optimization 2 Optimierung 2 Prioritätsregel 2 Produktdifferenzierung 2 Produktionssteuerung 2 Reihenfolgeproblem 2 Aerospace Industry 1 Assembly line sequencing 1 Ausbringung 1 Batched part supply 1 Benders decomposition 1 Bi-level scheduling 1
more ... less ...
Online availability
All
Undetermined 9 Free 2
Type of publication
All
Book / Working Paper 22 Article 5
Type of publication (narrower categories)
All
Article in journal 3 Aufsatz in Zeitschrift 3 Working Paper 2 Arbeitspapier 1 Graue Literatur 1 Non-commercial literature 1
Language
All
English 23 Undetermined 4
Author
All
Boysen, Nils 17 Fliedner, Malte 15 Scholl, Armin 14 Bierwirth, Christian 2 Drexl, Andreas 2 Kimms, Alf 2 Krüger, Doreen 2 Mattfeld, Dirk C. 2 Allweyer, Thomas 1 Bock, Stefan 1 Emde, Simon 1 Kong, Min 1 Loos, Peter 1 Matthiessen, Lars 1 Matthießen, Lars 1 Mladenovic, Nenad 1 Pardalos, Panos M. 1 Pei, Jun 1 Pereira, Jordi 1 Pesch, Erwin 1 Polten, Lukas 1 Scheer, August-Wilhelm 1 Vilà, Mariona 1 Wang, Haoxin 1
more ... less ...
Institution
All
Universität <Jena> / Wirtschaftswissenschaftliche Fakultät 13 Wirtschaftswissenschaftliche Fakultät, Friedrich-Schiller-Universität Jena 6 Universität <Bremen> / Lehrstuhl für Logistik 1
Published in...
All
Friedrich-Schiller-Universität Jena - Wirtschaftswissenschaftliche Universität - Jena Research Papers 13 Jena Research Papers inBusiness and Economics 13 Jena Research Papers in Business and Economics - Working and Discussion Papers 5 International journal of production research 2 Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 2 Universität Bremen - Lehrstuhl für Logistik - Publikationen 2 Institut für Wirtschaftsinformatik (IWi) im Deutschen Forschungszentrum für Künstliche Intelligenz (DFKI GmbH), Universität des Saarlandes, Saarbrücken - Publikationen 1 Jenaer Schriften zur Wirtschaftswissenschaft 1 Journal of scheduling 1 Parmee, I.C. (Ed.), Proceedings of ACDM98, Springer-Verlag, Stuttgart 1998, pp. 59 - 67 1 Veröffentlichungen des Instituts für Wirtschaftsinformatik 1
more ... less ...
Source
All
USB Cologne (business full texts) 16 RePEc 6 ECONIS (ZBW) 4 EconStor 1
Showing 1 - 10 of 27
Cover Image
Bi-level scheduling in high-end equipment R&D : when more algorithm strategies may not be better
Pei, Jun; Wang, Haoxin; Kong, Min; Mladenovic, Nenad; … - In: International journal of production research 61 (2023) 16, pp. 5436-5467
Persistent link: https://www.econbiz.de/10014382313
Saved in:
Cover Image
Sequencing assembly lines to facilitate synchronized just-in-time part supply
Emde, Simon; Polten, Lukas - In: Journal of scheduling 22 (2019) 6, pp. 607-621
Persistent link: https://www.econbiz.de/10012125307
Saved in:
Cover Image
An exact algorithm for the mixed-model level scheduling problem
Pereira, Jordi; Vilà, Mariona - In: International journal of production research 53 (2015) 19, pp. 5809-5825
Persistent link: https://www.econbiz.de/10011421068
Saved in:
Cover Image
Level Scheduling under limitedResequencing Flexibility
Fliedner, Malte; Boysen, Nils; Scholl, Armin - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2010
-called Level Scheduling (LS), which aims to distribute the part consumption in-duced by a model sequence evenly over the planning …
Persistent link: https://www.econbiz.de/10005870689
Saved in:
Cover Image
Scheduling Just-in-Time Part Supplyfor Mixed-Model Assembly Lines
Bock, Stefan; Boysen, Nils - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2010
is the first time astatistical analysis is being made as to whether widespread Level Scheduling policies,which are well …
Persistent link: https://www.econbiz.de/10005870694
Saved in:
Cover Image
Level scheduling under limited resequencing flexibility
Boysen, Nils; Fliedner, Malte; Scholl, Armin - Wirtschaftswissenschaftliche Fakultät, … - 2010
so-called Level Scheduling (LS), which aims to distribute the part consumption induced by a model sequence evenly over …
Persistent link: https://www.econbiz.de/10008565942
Saved in:
Cover Image
Cross Dock Scheduling: Classification,Literature Review and Research Agenda
Boysen, Nils; Fliedner, Malte - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2009
At cross docking terminals incoming deliveries of inbound trucks are unloaded,sorted, moved across the dock and nally loaded onto outboundtrucks, which immediately leave the terminal towards their next destinationin the distribution chain. Accordingly, a cross dock is a consolidationpoint in a...
Persistent link: https://www.econbiz.de/10005870693
Saved in:
Cover Image
Level Scheduling for batched JIT supply
Fliedner, Malte; Boysen, Nils; Scholl, Armin - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2009
socalled Level Scheduling, which aims at distributing the part consumption induced bythe model sequence evenly over time …. Traditional Level Scheduling seeks to closelyapproximate target demand rates at every production cycle, however, such a … pattern between two delivery pointsseems irrelevant. The paper on hand provides new Level Scheduling models, provescomplexity …
Persistent link: https://www.econbiz.de/10005870695
Saved in:
Cover Image
The assembly line balancing and schedulingproblem with sequence-dependent setup times:Problem extension, model formulation andefficient heuristics
Scholl, Armin; Boysen, Nils; Fliedner, Malte - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2009
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the productsto be assembled among the work stations along a manufacturing line as used in the automotive or the electronics industries.Usually, it is assumed in research papers that,...
Persistent link: https://www.econbiz.de/10005870709
Saved in:
Cover Image
Determining Crane Areas inIntermodal Transshipment Yards:The Yard Partition Problem
Boysen, Nils; Fliedner, Malte - Universität <Jena> / Wirtschaftswissenschaftliche Fakultät - 2009
At rail-road transshipment yards, gantry cranes move containers from freighttrains to trucks and vice versa. They constitute important entities in today'sintermodal transportation systems. Real-world yards are often partitionedinto several disjunct crane areas, so that crane interferences during...
Persistent link: https://www.econbiz.de/10005870715
Saved in:
  • 1
  • 2
  • 3
  • Next
  • Last
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...