EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"Part supply"
Narrow search

Narrow search

Year of publication
Subject
All
Automobile industry 2 CO2 emission 2 In-house logistics 2 Lieferkette 2 Mixed-model assembly lines 2 Part supply 2 Spare part's supply chain network 2 Supply chain 2 facility disruption probability 2 location-inventory problem 2 queuing theory 2 Assembly-line production 1 Automotive industry 1 Batched part supply 1 Disruption management 1 Ersatzteil 1 Fließfertigung 1 Food retailing 1 Greenhouse gas emissions 1 Instandhaltung 1 Inventory model 1 Just in Time 1 Just in time 1 Just-in-Time 1 Kfz-Industrie 1 Lagerhaltungsmodell 1 Lebensmitteleinzelhandel 1 Level Scheduling 1 Logistics 1 Logistik 1 Maintenance policy 1 Materials management 1 Materialwirtschaft 1 Mixed-model assembly line 1 Queueing theory 1 Scheduling problem 1 Scheduling-Verfahren 1 Sequencing 1 Spare parts 1 Störungsmanagement 1
more ... less ...
Online availability
All
Free 2 Undetermined 2 CC license 1
Type of publication
All
Article 4 Book / Working Paper 1
Type of publication (narrower categories)
All
Article in journal 2 Aufsatz in Zeitschrift 2 Article 1
Language
All
English 4 Undetermined 1
Author
All
Boysen, Nils 3 Emde, Simon 2 Karim, Rubayet 2 Nakade, Koichi 2 Fliedner, Malte 1 Scholl, Armin 1
Institution
All
Wirtschaftswissenschaftliche Fakultät, Friedrich-Schiller-Universität Jena 1
Published in...
All
European Journal of Operational Research 1 European journal of operational research : EJOR 1 Jena Research Papers in Business and Economics - Working and Discussion Papers 1 Journal of Industrial Engineering and Management (JIEM) 1 Journal of industrial engineering and management : JIEM 1
Source
All
ECONIS (ZBW) 2 RePEc 2 EconStor 1
Showing 1 - 5 of 5
Cover Image
An integrated location-inventory model for a spare part's supply chain considering facility disruption risk and CO₂ emission
Karim, Rubayet; Nakade, Koichi - In: Journal of Industrial Engineering and Management (JIEM) 14 (2021) 2, pp. 87-119
's manufacturer can optimize the total average cost of the spare part's supply chain through making a trade-off between productions … considered the probabilistic facility disruption risk and carbon emission for modeling the spare part's supply chain network. …
Persistent link: https://www.econbiz.de/10013326227
Saved in:
Cover Image
An integrated location-inventory model for a spare part's supply chain considering facility disruption risk and CO2 emission
Karim, Rubayet; Nakade, Koichi - In: Journal of industrial engineering and management : JIEM 14 (2021) 2, pp. 87-119
's manufacturer can optimize the total average cost of the spare part's supply chain through making a trade-off between productions … considered the probabilistic facility disruption risk and carbon emission for modeling the spare part's supply chain network. …
Persistent link: https://www.econbiz.de/10012502437
Saved in:
Cover Image
Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets
Boysen, Nils; Emde, Simon - In: European Journal of Operational Research 239 (2014) 3, pp. 820-829
paper treats the scheduling of the part supply processes within line-integrated supermarkets. The scheduling problem for …
Persistent link: https://www.econbiz.de/10010906811
Saved in:
Cover Image
Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets
Boysen, Nils; Emde, Simon - In: European journal of operational research : EJOR 239 (2014) 3, pp. 820-829
Persistent link: https://www.econbiz.de/10010411475
Saved in:
Cover Image
Level Scheduling for batched JIT supply
Boysen, Nils; Fliedner, Malte; Scholl, Armin - Wirtschaftswissenschaftliche Fakultät, … - 2009
A mixed-model assembly line requires the solution of a short-term sequencing problem which decides on the succession of different models launched down the line. A famous solution approach stemming from the Toyota Production System is the so called Level Scheduling, which aims at distributing the...
Persistent link: https://www.econbiz.de/10005785957
Saved in:
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...