EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"sequence-independent setup times"
Narrow search

Narrow search

Year of publication
Subject
All
sequence-independent setup times 3 ACA 2 ELSP 2 ant colony algorithm 2 costs 2 economic lot scheduling problem 2 genetic algorithms 2 lot sizing 2 metaheuristics 2 sequence-dependent setup times 2 simulated-annealing 2 time-varying lot sizes 2 Cellular manufacturing 1 Durchlaufzeit 1 Fertigungsinsel 1 Heuristics 1 Heuristik 1 Lagrangian relaxation 1 Lead time 1 Lower bounds 1 Material flow 1 Materialfluss 1 Scheduling 1 Scheduling problem 1 Scheduling-Verfahren 1 Sequence-independent setup times 1 Total completion time 1 Two-machine flowshop 1 cell scheduling problem 1 group scheduling 1 inter-cellular moves 1 non-permutation schedules 1
more ... less ...
Online availability
All
Undetermined 3
Type of publication
All
Article 4
Type of publication (narrower categories)
All
Article in journal 1 Aufsatz in Zeitschrift 1
Language
All
Undetermined 3 English 1
Author
All
Chandrasekaran, C. 2 Chetty, O.V. Krishnaiah 2 Hanumanna, Donakonda 2 Rajendran, Chandrasekharan 2 Buscher, Udo 1 Gharbi, Anis 1 Ladhari, Talel 1 Msakni, Mohamed Kais 1 Neufeld, J. S. 1 Serairi, Mehdi 1 Teucher, F. F. 1
more ... less ...
Published in...
All
European Journal of Industrial Engineering 2 European Journal of Operational Research 1 International journal of production research 1
Source
All
RePEc 3 ECONIS (ZBW) 1
Showing 1 - 4 of 4
Cover Image
Scheduling flowline manufacturing cells with inter-cellular moves : non-permutation schedules and material flows in the cell scheduling problem
Neufeld, J. S.; Teucher, F. F.; Buscher, Udo - In: International journal of production research 58 (2020) 21, pp. 6568-6584
Persistent link: https://www.econbiz.de/10012315468
Saved in:
Cover Image
The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies
Gharbi, Anis; Ladhari, Talel; Msakni, Mohamed Kais; … - In: European Journal of Operational Research 231 (2013) 1, pp. 69-78
The two-machine flowshop environment with sequence-independent setup times has been intensely investigated both from …
Persistent link: https://www.econbiz.de/10010682482
Saved in:
Cover Image
Metaheuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach
Chandrasekaran, C.; Rajendran, Chandrasekharan; Chetty, … - In: European Journal of Industrial Engineering 1 (2007) 2, pp. 152-181
algorithms for ELSP with sequence-independent setup times of products are evaluated by considering a couple of benchmark problems …
Persistent link: https://www.econbiz.de/10005754458
Saved in:
Cover Image
Metaheuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach
Chandrasekaran, C.; Rajendran, Chandrasekharan; Chetty, … - In: European Journal of Industrial Engineering 1 (2007) 2, pp. 152-181
algorithms for ELSP with sequence-independent setup times of products are evaluated by considering a couple of benchmark problems …
Persistent link: https://www.econbiz.de/10008563645
Saved in:
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...