EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject:"shifting bottleneck procedure"
Narrow search

Narrow search

Year of publication
Subject
All
Bottleneck 4 Engpass 4 Heuristics 4 Heuristik 4 Scheduling problem 4 Scheduling-Verfahren 4 shifting bottleneck procedure 4 Graph theory 3 Graphentheorie 3 Production control 3 Produktionssteuerung 3 bounded processing times 3 disjunctive graph 3 job shop scheduling 3 Algorithm 2 Algorithmus 2 Durchlaufzeit 2 HSP 2 Lead time 2 hoist scheduling problem 2 Assembly-line production 1 Decomposition 1 Dominance rule 1 Evolutionary algorithm 1 Evolutionärer Algorithmus 1 Fließfertigung 1 Iterated local search 1 Job shop scheduling 1 Shifting Bottleneck Procedure 1 Shifting bottleneck procedure 1 Theorie 1 Theory 1 Total weighted tardiness 1 adjacency matrix 1 assembly job shop 1 delayed precedence constraints 1 extended disjunctive graph 1 heuristics 1 hybrid genetic algorithm 1 operation constraint chain 1
more ... less ...
Online availability
All
Undetermined 4
Type of publication
All
Article 6
Type of publication (narrower categories)
All
Article in journal 4 Aufsatz in Zeitschrift 4
Language
All
English 4 Undetermined 2
Author
All
Manier, Hervé 3 Manier, Marie-Ange 3 Zhang, Qiao 3 Balas, Egon 1 Bloch, Christelle 1 Block, Christelle 1 Braune, Roland 1 Lenstra, Jan Karel 1 Meng, Yue 1 Shi, Fei 1 Vazacopoulos, Alkis 1 Zhao, Shikui 1 Zäpfel, Günther 1
more ... less ...
Published in...
All
International journal of production research 2 Computers & operations research : and their applications to problems of world concern ; an international journal 1 European Journal of Industrial Engineering 1 European journal of industrial engineering : EJIE 1 Management Science 1
Source
All
ECONIS (ZBW) 4 RePEc 2
Showing 1 - 6 of 6
Cover Image
Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem
Shi, Fei; Zhao, Shikui; Meng, Yue - In: International journal of production research 58 (2020) 9, pp. 2604-2625
Persistent link: https://www.econbiz.de/10012265257
Saved in:
Cover Image
Shifting bottleneck scheduling for total weighted tardiness minimization : a computational evaluation of subproblem and re-optimization heuristics
Braune, Roland; Zäpfel, Günther - In: Computers & operations research : and their … 66 (2016), pp. 130-140
Persistent link: https://www.econbiz.de/10011429000
Saved in:
Cover Image
Heuristics fro predictive hoist scheduling problems
Zhang, Qiao; Manier, Hervé; Manier, Marie-Ange; Block, … - In: European journal of industrial engineering : EJIE 8 (2014) 5, pp. 695-714
Persistent link: https://www.econbiz.de/10011288674
Saved in:
Cover Image
Heuristics for predictive hoist scheduling problems
Zhang, Qiao; Manier, Hervé; Manier, Marie-Ange; Bloch, … - In: European Journal of Industrial Engineering 8 (2014) 5, pp. 695-715
In this paper, we consider hoist scheduling problems in a job shop environment. For each job several operations can be operated on tanks, and their processing times are bounded. The objective is to assign resources to both processing and transport operations and then to schedule those tasks on...
Persistent link: https://www.econbiz.de/10011093676
Saved in:
Cover Image
A modified shifting bottleneck heuristic and disjunctive graph for job shop scheduling problems with transportationa constraints
Zhang, Qiao; Manier, Hervé; Manier, Marie-Ange - In: International journal of production research 52 (2014) 4, pp. 985-1002
Persistent link: https://www.econbiz.de/10010256319
Saved in:
Cover Image
The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
Balas, Egon; Lenstra, Jan Karel; Vazacopoulos, Alkis - In: Management Science 41 (1995) 1, pp. 94-109
the second (delayed precedence constraints). This problem arises naturally in the context of the Shifting Bottleneck … for the standard one-machine problem. Embedding this algorithm into a modified version of the Shifting Bottleneck … Procedure for the general job shop scheduling problem, as a relaxation of the latter, tighter than the standard one …
Persistent link: https://www.econbiz.de/10009214260
Saved in:
A service of the
zbw
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...