Showing 1 - 10 of 14
Persistent link: https://www.econbiz.de/10011854217
Persistent link: https://www.econbiz.de/10011978637
Persistent link: https://www.econbiz.de/10012659734
In this paper, we present a new approach to solve the railway rescheduling problem. This problem deals with the reparation of a disturbed railway timetable after incidents in such a way to minimize the difference between the original plan and the new provisional plan. We use a mixed integer...
Persistent link: https://www.econbiz.de/10009249578
Persistent link: https://www.econbiz.de/10011412443
Persistent link: https://www.econbiz.de/10011759544
Persistent link: https://www.econbiz.de/10012226383
Persistent link: https://www.econbiz.de/10011654113
Persistent link: https://www.econbiz.de/10011875250
Persistent link: https://www.econbiz.de/10012549336