Showing 1 - 10 of 118
We consider the problem of scheduling operations in bufferless robotic cells that produce identical parts. The objective is to find a cyclic sequence of robot moves that minimizes the long-run average time to produce a part or, equivalently, maximizes the throughput rate. The robot can be moved...
Persistent link: https://www.econbiz.de/10009218532
This paper analyzes the trade-off between (demand) substitution costs and (production) changeover costs in a discrete-time production-inventory setting using a two-product dynamic lot-sizing model with changeover, inventory carrying, and substitution costs. We first show that the problem is...
Persistent link: https://www.econbiz.de/10009218589
Persistent link: https://www.econbiz.de/10005095226
Persistent link: https://www.econbiz.de/10005337979
Persistent link: https://www.econbiz.de/10005240652
Persistent link: https://www.econbiz.de/10012192700
Persistent link: https://www.econbiz.de/10012192702
Persistent link: https://www.econbiz.de/10012273880
Persistent link: https://www.econbiz.de/10012096241
Persistent link: https://www.econbiz.de/10012283842