Showing 1 - 10 of 43
Persistent link: https://www.econbiz.de/10005347783
Persistent link: https://www.econbiz.de/10005151758
Persistent link: https://www.econbiz.de/10005253739
Persistent link: https://www.econbiz.de/10005277540
Persistent link: https://www.econbiz.de/10005337564
Persistent link: https://www.econbiz.de/10005283658
In this paper, a survey of scheduling problems with due windows is presented. The due window of a job is a generalization of the classical due date and it is a time interval in which this job should be finished. If the job is completed before or after the due window, it incurs an earliness or a...
Persistent link: https://www.econbiz.de/10011190768
Persistent link: https://www.econbiz.de/10005075281
A discrete-continuous problem of non-preemptive task scheduling on identical parallel processors is considered. Tasks are described by means of a dynamic model, in which the speed of the task performance depends on the amount of a single continuously divisible renewable resource allotted to this...
Persistent link: https://www.econbiz.de/10008483401
Persistent link: https://www.econbiz.de/10005337106