The multi-mode resource constrained project scheduling problem (MM RCPSP) is a generalization of the well-studied RCPSP. A literature review reveals applications of inexact heuristics or metaheuristics approaches for solving these problems, however, exact approaches are few and do not consider...
Persistent link: https://www.econbiz.de/10011199948
The multi-mode resource constrained project scheduling problem (MM RCPSP) is a NP-hard problem representing a generalization of the well-studied RCPSP. Depth-first tree search approach by Sprecher & Drexl (1998) is the best known exact solution tree search procedure for this problem. In this...
Persistent link: https://www.econbiz.de/10011203050
India is a vast country. After its independence in 1947, it steadily lost its position in international trade. With the beginning of economic liberalization in 1991, it has taken new initiatives in integrating itself with the world economy. Import restrictions have been removed for many...
Persistent link: https://www.econbiz.de/10008801467
In a recent paper, Icmeli and Erengue (1996) present an algorithm to maximize the Net Present Value (NPV) of a given project under renewable resource constraints. It is shown here, with the help of an example, that in some cases the algorithm fails to find an optimal solution. A simple...
Persistent link: https://www.econbiz.de/10008801494
A four-step strategy is proposed for scheduling a set of partially ordered resource-constrained activities on a given number of identical parallel machines. For regular measures, the generated schedule is optimal. In the first step, the difficulty level of the problem instance is estimated using...
Persistent link: https://www.econbiz.de/10008801582
A simple best-first tree search scheme with pruning rules to minimize the completion time (makespan) of the project is described. A project consists of a set of activities partially ordered by precedence constraints. An activity has a given non-negative duration and uses renewable resources such...
Persistent link: https://www.econbiz.de/10008802227
We describe a general best-first tree search scheme that schedules a set of partially ordered jobs under resource constraints to optimize a non-regular performance measure. The scheme has been implemented for two categories of problems. In the first category, jobs have individual duedates, and...
Persistent link: https://www.econbiz.de/10008802288
A firm’s ‘competitive advantage’ is considered to arise from certain ‘factors internal to the firm as postulated by the resource based view’ or from ‘external sources and industry structure.’ However, it remains unclear as to “how” these factors result in competitive advantage,...
Persistent link: https://www.econbiz.de/10011096590
The objective of this paper is to review and synthesize the literature of psychological contract in order to provide a comprehensive framework of psychological contract through individual and multi-level analysis. The article provides an inclusive review of antecedents (individual and...
Persistent link: https://www.econbiz.de/10011097387
The influence of factors outside the boundaries of organization is largely ignored in the examination of psychological contract. The objective of the current research is to empirically examine the association between industry/sector and psychological contract. The article examines the variation...
Persistent link: https://www.econbiz.de/10011097388