Showing 1 - 10 of 14
This paper develops efficient forward algorithms and planning horizon results for several machine replacement models under an improving technological environment over time. The models are that of cost minimization, profit maximization, and cost minimization with probabilistic breakdowns. The...
Persistent link: https://www.econbiz.de/10009191995
This paper develops efficient forward algorithms and planning horizon results for several machine replacement models under an improving technological environment over time. The models are that of cost minimization, profit maximization, and cost minimization with probabilistic breakdowns. The...
Persistent link: https://www.econbiz.de/10012707634
We derive a sharp upper bound on the minimal forecast horizon in the discounted dynamic lot size model with constant initial demand. This bound is given by m(m 1), where m is the EOQ's worth, i.e., the number of periods for which the total demand equals Economic Order Quantity. Our results do...
Persistent link: https://www.econbiz.de/10012706709
This paper considers an economic lot size (ELS) model for perishable products where an inventory stock's deterioration rate and its carrying cost in each period depend on the age of the stock. We discuss situations where the traditional ELS models are not applicable, and propose a new model with...
Persistent link: https://www.econbiz.de/10009197582
Short delivery time and the efficient management of component inventories are two crucial elements that determine the competitiveness of many contract assembly manufacturers, especially in the electronics industry. In this paper, we develop and analyze an optimization model to determine the...
Persistent link: https://www.econbiz.de/10009208492
The following typographical errors appeared in our paper "Planning Horizon Procedures for Machine Replacement Models," Management Science, Vol. 25, No. 2 (February 1979), pp. 140-151.
Persistent link: https://www.econbiz.de/10009189684
This paper develops rolling horizon procedures for solving a multistage inventory problem with facilities-in-series. In such an inventory system, we assume that the raw material is processed successively through several facilities before reaching the customer. The input to a facility comes from...
Persistent link: https://www.econbiz.de/10009191456
This paper develops a "perfect planning horizon procedure" for the simple cash balance problem, where the objective of the firm is to schedule the selling and buying of its earning assets so that all the positive demands are met at minimum cost. Demand for cash can be both positive or negative; a...
Persistent link: https://www.econbiz.de/10009191607
We derive a sharp upper bound on the minimal forecast horizon in the discounted dynamic lot size model with constant initial demand. This bound is given by m(m + 1), where m is the EOQ's worth, i.e., the number of periods for which the total demand equals Economic Order Quantity. Our results do...
Persistent link: https://www.econbiz.de/10009214389
A study of water resources development in South Sweden revealed that water consumption unexpectedly stopped growing after construction had begun on a large project to expand water supplies. The project had a long lead time for completion, and planning had been based on traditional deterministic...
Persistent link: https://www.econbiz.de/10009197742