Showing 1 - 10 of 34
Persistent link: https://www.econbiz.de/10006096833
Persistent link: https://www.econbiz.de/10002916083
Persistent link: https://www.econbiz.de/10002916134
Persistent link: https://www.econbiz.de/10005414266
Persistent link: https://www.econbiz.de/10006026637
Persistent link: https://www.econbiz.de/10008477024
This research focuses on the effect of setup time on lot sizing. The setting is the Capacitated Lot Sizing Problem (the single-machine lot sizing problem) with nonstationary costs, demands, and setup times. A Lagrangian relaxation of the capacity constraints of CLSP allows it to be decomposed...
Persistent link: https://www.econbiz.de/10009191407
This paper concerns the modeling of low inventory lines. Currently, most models assume that processing times are independent. We consider the differences in behavior of workers in low- and high-inventory production lines. Using a laboratory experiment we show that workers speed up when they are...
Persistent link: https://www.econbiz.de/10009191474
In practice, most multi-echelon inventory systems are managed using adaptations of single location methods. This paper shows that such methods can be dramatically inferior to methods designed to take advantage of a system's structure. This is especially true in repair parts inventory systems...
Persistent link: https://www.econbiz.de/10009191649
This paper investigates a multi-item, multi-level production scheduling problem with linear costs and production and inventory constraints at one key facility. Two multi-item problems---one in which the constraint was on shipping capability and one in which there was a final stage bottleneck...
Persistent link: https://www.econbiz.de/10009197635