Showing 1 - 10 of 83
Persistent link: https://www.econbiz.de/10006656024
Persistent link: https://www.econbiz.de/10006844976
In this paper, we extend Teng, J.T., Chang, H.J., Dye, C.Y., Hung, C.H. [2002. An optimal replenishment policy for deteriorating items with time-varying demand and partial backlogging. Operations Research Letters 30(6), 387-393.] and Hou, K.L. [2006. An inventory model for deteriorating items...
Persistent link: https://www.econbiz.de/10008521481
In this paper, the traditional inventory lot-size model is extended to allow not only for general partial backlogging rate but also for inflation. The assumptions of equal cycle length and constant shortage length imposed in the model developed by Moon et al. [Moon, I., Giri, B.C., Ko, B., 2005....
Persistent link: https://www.econbiz.de/10005253821
Persistent link: https://www.econbiz.de/10005283844
Persistent link: https://www.econbiz.de/10008052161
Persistent link: https://www.econbiz.de/10008891301
For a finite planning horizon, there has been a considerable body of research papers in the area of operations management that dealt with four different inventory shortage models in the last two decades. In this paper, we establish the models to reflect the fact that the longer the waiting time,...
Persistent link: https://www.econbiz.de/10004977543
Persistent link: https://www.econbiz.de/10006658958
Persistent link: https://www.econbiz.de/10005283381