This paper studies the allocation of buffer times in a single machine environment. Buffer times are a common tool to protect the schedule against disruptions such as machine failures. We introduce new classes of robust machine scheduling problems. For an arbitrary scheduling problem 1
Persistent link: https://www.econbiz.de/10011558710
This paper studies inventory constraints in a machine scheduling environment. Jobs can add and remove items of different types to the inventory and from the inventory, respectively. Jobs removing items cannot be processed if the required amount of items is not available. We first have a look at...
Persistent link: https://www.econbiz.de/10011558711
We consider the problem of allocating containers to ships in which the size of container is 1 or 2, and each ship has its own capacity and fixed departure time. The fixed departure times implies the completion times of containers belonging to the same ship are identical. As objectives, Lmax,...
Persistent link: https://www.econbiz.de/10011558712
This paper focuses on Single machine scheduling subject to inventory constraints. Jobs add and remove items to and from, respectively, the inventory. Jobs that remove items cannot be processed if the required number of items is not available. We consider scheduling problems on a Single machine...
Persistent link: https://www.econbiz.de/10011558720
Electrifying road-based long-haul transportation is an intricate task. Given the current state of battery technology, either the driving ranges of electric commercial vehicles (ECVs) are too short or high-capacity batteries are costly and so heavy that payloads are limited. An old, yet recently...
Persistent link: https://www.econbiz.de/10015209765
Single machine scheduling with sequence-dependent setup times is one of the classical problems of production planning with widespread applications in many industries. Solving this problem under the min-makespan objective is well known to be strongly NP-hard. We consider a special case of the...
Persistent link: https://www.econbiz.de/10014501705
To enable the efficient division of labor in container yards, many large ports apply twin cranes, two identical automated stacking cranes each dedicated to one of the transfer zones on the seaside and landside. The use of a handshake area, a bay of containers that separates the dedicated areas...
Persistent link: https://www.econbiz.de/10014501792
The scheduling of gantry cranes with respect to mutual interference has received considerable attention in recent years. We consider a subproblem which arises when each crane has a sequence of tasks to be assigned. The problem is concerned with resolving the interference between two cranes by...
Persistent link: https://www.econbiz.de/10014502067
Due to high real estate costs in urban areas, shop floor space is scarce in most brick‐and‐mortar stores. Maneuvering newly arrived merchandise through narrow aisles during shelf replenishment is time‐consuming for the sales staff and impedes customers. Therefore, many retail chains...
Persistent link: https://www.econbiz.de/10014504212
In recent years, more and more disasters occurred. Additionally, the amount of people affected by disasters increased. Because of this, it is of great importance to perform the relief operations efficiently in order to alleviate the suffering of the disaster victims. Immediately after the...
Persistent link: https://www.econbiz.de/10014504366