Showing 1 - 10 of 16
In this paper, we use pattern clustering and multivariate analysis of variance methods to analyze the daily load patterns in Ontario, Canada, in order to determine the impact of the time of use (TOU) rate implementation. Our findings show that in the first year after the implementation, there...
Persistent link: https://www.econbiz.de/10010807911
In this paper, we use a Markov decision process (MDP) to model the joint inventory-promotion decision problem. The state variable of the MDP represents the demand state brought about by changing environmental factors as well as promotion decisions. The demand state in a period determines the...
Persistent link: https://www.econbiz.de/10009214483
This study is motivated by a process-reengineering problem in personal computer (PC) manufacturing, i.e., to move from a build-to-stock operation that is centered around end-product inventory towards a configure-to-order (CTO) operation that eliminates endproduct inventory. In fact, CTO has made...
Persistent link: https://www.econbiz.de/10009218511
Persistent link: https://www.econbiz.de/10005417990
Persistent link: https://www.econbiz.de/10011162016
We study a coordination contract for a supplier-retailer channel producing and selling a fashionable product exhibiting a stochastic price-dependent demand. The product's selling season is short, and the supply chain faces great demand uncertainty. We consider a scenario where the supplier...
Persistent link: https://www.econbiz.de/10008483308
Persistent link: https://www.econbiz.de/10005253843
This paper develops efficient forward algorithms and planning horizon results for several machine replacement models under an improving technological environment over time. The models are that of cost minimization, profit maximization, and cost minimization with probabilistic breakdowns. The...
Persistent link: https://www.econbiz.de/10009191995
A study of water resources development in South Sweden revealed that water consumption unexpectedly stopped growing after construction had begun on a large project to expand water supplies. The project had a long lead time for completion, and planning had been based on traditional deterministic...
Persistent link: https://www.econbiz.de/10009197742
This note formulates an assignment problem for obtaining optimal level schedules for mixed-model assembly lines in JIT production systems. The problem was formulated as a quadratic integer programming problem in a recent paper by Miltenburg (1989) where, however, only enumerative algorithms and...
Persistent link: https://www.econbiz.de/10009209084