Showing 1 - 10 of 47
Using a proprietary data set provided by a major manufacturer of aircraft engines, we empirically investigate how product reliability is impacted by the use of two different types of after-sales maintenance support contracts: time and material contracts (T&MC) and performance-based contracts...
Persistent link: https://www.econbiz.de/10010990484
Firms that rely on functioning mission-critical equipment for their businesses cannot afford significant operational downtime due to system disruptions. To minimize the impact of disruptions, a proper incentive mechanism has to be in place so that the suppliers provide prompt restoration and...
Persistent link: https://www.econbiz.de/10009197426
Performance-based contracting is reshaping service support supply chains in capital-intensive industries such as aerospace and defense. Known as "power by the hour" in the private sector and as "performance-based logistics" (PBL) in defense contracting, it aims to replace traditionally used...
Persistent link: https://www.econbiz.de/10009208764
During development of an innovative product there is often considerable uncertainty about component production cost, and it is of interest for both the manufacturer and the supplier to engage in a collaborative effort to reduce this uncertainty and lower the expected cost. Despite the obvious...
Persistent link: https://www.econbiz.de/10010990474
This paper employs a new estimation method for estimating stage–discharge rating curve parameters. In typical practical applications, the original non-linear rating curve is transformed into a simple linear regression model by log-transforming the measurement without examining the effect of...
Persistent link: https://www.econbiz.de/10010847409
Persistent link: https://www.econbiz.de/10005684921
Persistent link: https://www.econbiz.de/10005598576
Persistent link: https://www.econbiz.de/10008515343
Persistent link: https://www.econbiz.de/10005061648
Persistent link: https://www.econbiz.de/10005660412