Showing 1 - 10 of 16
Persistent link: https://www.econbiz.de/10011447743
We consider the compensation design problem of a firm that hires a salesperson to exert effort to increase demand. We assume both demand and supply to be uncertain, with sales being the smaller of demand and supply, and assume that if demand exceeds supply then unmet demand is unobservable...
Persistent link: https://www.econbiz.de/10012900838
We study the impact of limited inventory on optimal salesforce compensation contracts. We use the framework of Oyer (2000), characterized by limited liability and rent sharing with the agent. A commonly invoked assumption in the inventory management literature is that the demand distribution...
Persistent link: https://www.econbiz.de/10012973751
Persistent link: https://www.econbiz.de/10012120920
Traditional sourcing arrangements for after-sales product support have centered around physical assets. Typically, a customer would pay the supplier of maintenance services in proportion to the resources used, such as spare parts, that are needed to maintain the product. In recent years, we have...
Persistent link: https://www.econbiz.de/10014044785
Using a proprietary dataset provided by a major manufacturer of aircraft engines, we empirically investigate how product reliability is impacted by use of two different types of after-sales maintenance support contracts: time and material contracts (T&MC) and performance-based contracts (PBC)....
Persistent link: https://www.econbiz.de/10013114939
Persistent link: https://www.econbiz.de/10014339287
Persistent link: https://www.econbiz.de/10009374387
Persistent link: https://www.econbiz.de/10003600441
Persistent link: https://www.econbiz.de/10010517126