Showing 1 - 4 of 4
In this study, an interval-parameter superiority–inferiority-based two-stage programming model has been developed for supporting community-scale renewable energy management (ISITSP-CREM). This method is based on an integration of the existing interval linear programming (ILP), two-stage...
Persistent link: https://www.econbiz.de/10010804840
An interval-parameter chanced-constrained full-infinite mixed-integer programming (ICFMP) approach is proposed for planning energy systems under functional interval uncertainties. ICFMP cannot only deal with crisp intervals, functional intervals, and probability distributions, but also support...
Persistent link: https://www.econbiz.de/10010806868
In this study, an inexact optimization modeling approach (IBEM: inexact Beijing energy model) was developed for supporting energy systems planning and air pollution mitigation under uncertainty. This model was based on the integration of multiple inexact optimization techniques, including...
Persistent link: https://www.econbiz.de/10010807262
In this study, an inexact mixed-integer fractional energy system planning (IMIF-EP) model is developed for supporting sustainable energy system management under uncertainty. Based on a hybrid of interval-parameter programming (IPP), fractional programming (FP) and mixed integer linear...
Persistent link: https://www.econbiz.de/10010718867