Showing 1 - 10 of 13
Persistent link: https://www.econbiz.de/10001991187
Persistent link: https://www.econbiz.de/10001991197
Persistent link: https://www.econbiz.de/10001991482
Persistent link: https://www.econbiz.de/10003512049
Persistent link: https://www.econbiz.de/10004661400
The Economic Lot Scheduling Problem (ELSP) on a single facility (or machine) with the time-varying lot-sizes approach and with sequence-independent/sequence-dependent setup times of parts or products is studied in this paper. The objective is to minimise the long-run average inventory carrying...
Persistent link: https://www.econbiz.de/10005754458
The Economic Lot Scheduling Problem (ELSP) on a single facility (or machine) with the time-varying lot-sizes approach and with sequence-independent/sequence-dependent setup times of parts or products is studied in this paper. The objective is to minimise the long-run average inventory carrying...
Persistent link: https://www.econbiz.de/10008563645
Persistent link: https://www.econbiz.de/10009882495
Persistent link: https://www.econbiz.de/10001991141
Persistent link: https://www.econbiz.de/10001991155