Showing 1 - 10 of 47
This paper focuses on the multi-objective resolution of a reentrant hybrid flow shop scheduling problem (RHFS). In our case the two objectives are: the maximization of the utilization rate of the bottleneck and the minimization of the maximum completion time. This problem is solved with a new...
Persistent link: https://www.econbiz.de/10008483367
This article examines the multi-objective scheduling of a reentrant hybrid flow shop. This type of shop is composed of several stages made of several identical parallel machines. When a task has to be processed on a stage, it is assigned to the machine with the smallest workload. This problem...
Persistent link: https://www.econbiz.de/10010832818
Persistent link: https://www.econbiz.de/10003900525
Persistent link: https://www.econbiz.de/10008349024
Persistent link: https://www.econbiz.de/10009893849
Persistent link: https://www.econbiz.de/10011518991
Persistent link: https://www.econbiz.de/10005417791
Persistent link: https://www.econbiz.de/10006229784
Persistent link: https://www.econbiz.de/10009298357
Persistent link: https://www.econbiz.de/10010222692