Showing 1 - 10 of 3,557
In this paper we investigate the complexity of the economic lot-sizing problem with remanufacturing (ELSR) options … can also be satisfied by remanufacturing returned items. Although the ELSR problem can be solved efficiently for some …
Persistent link: https://www.econbiz.de/10010837897
remanufacturing option. In this extended problem, known quantities of used products are returned from customers in each period. These …
Persistent link: https://www.econbiz.de/10010731598
Persistent link: https://www.econbiz.de/10014382683
Persistent link: https://www.econbiz.de/10010241952
Persistent link: https://www.econbiz.de/10011308446
Persistent link: https://www.econbiz.de/10011991212
Persistent link: https://www.econbiz.de/10011871178
paper, we study the algorithmic complexity of the two resulting planning problems. For minimizing costs, a classical dynamic …
Persistent link: https://www.econbiz.de/10011190778
Persistent link: https://www.econbiz.de/10010491636
Persistent link: https://www.econbiz.de/10012293962