Showing 1 - 10 of 2,770
scheduling problem. This heuristic uses a lookahead parameter whose value must be specified. In this paper we develop a function …
Persistent link: https://www.econbiz.de/10005059504
Persistent link: https://www.econbiz.de/10010222527
Persistent link: https://www.econbiz.de/10010189892
Persistent link: https://www.econbiz.de/10011672957
Persistent link: https://www.econbiz.de/10011656559
Persistent link: https://www.econbiz.de/10011941722
Persistent link: https://www.econbiz.de/10014339639
Single machine scheduling with sequence-dependent setup times is one of the classical problems of production planning …
Persistent link: https://www.econbiz.de/10014501705
Persistent link: https://www.econbiz.de/10013171751
In this paper, we present beam search heuristics for the single machine scheduling problem with quadratic earliness and …
Persistent link: https://www.econbiz.de/10005059449